307 College Avenue (Collegetown Crossing) Construction Update, 6/2016

20 06 2016

307 College isn’t too far from completion at this point. The angles where with CMU dominates the exterior look nearly finished from the outside. Some of the windows are in on the front side – the projecting section, currently covered in Tyvek housewrap, will be mostly faced with dark brick, similar to the brick used on the rear CR-4 portion. The bare expanses will be a glass curtain wall, and a lighter brick will be used on the sides and for the cornice. Traditional scaffolding needs a certain amount of space and time to be set up and taken down, so given the dense environment and summer deadline of the Collegetown Crossing project, mast climbing work platforms are used being for the bricklaying and other exterior facade work.

Greenstar’s new grocery location on the first floor should be opening August 17th, right around when the first tenants start moving into the apartments. It sounds like it will be a soft opening, with an actual Grand Opening celebration planned for some date in September. A render of the interior of the new Greenstar location, designed by architect Pam Wooster, is included below. Greenstar plans to employ 14 at the new location, and include a cafe/to-go space to complement its full-service grocery (some of the items, like those in the deli, won’t be prepared on site due to space constraints; they will be prepared at their central kitchen and brought in daily). There hasn’t been any news on tenants for the smaller two commercial spaces facing the pocket park.

20160608_162651 20160608_162721 20160608_162758 20160608_162805 20160608_162829 20160608_162923

20160608_161811 20160608_162435 20160608_162527

20160608_162035

307college_rev2_1

ctown_crossing_rev2_1

greenstar_ctown.png

greenstar_ctown_2.png