Upson Hall Construction Update, 7/2016

1 08 2016

There are two different facade installations going on here – the terracotta, and the aluminum. For the terracotta, the process goes like this. First, we have the gypsum sheathing, coated with a turquoise-colored water-resistive barrier. The ends of the aluminum clips are installed onto the sheathing, and then mineral wool insulation is attached between the clip. Then, the rest of the aluminum clip is attached over the mineral wool. From there, terracotta panels are hung up and secured to the clips. The aluminum window surrounds don’t need this type of work, so the panels are just hung as-is over the sheathing.

According to Cornell’s Upson Hall webpage, Phase I is nearing completion at this point. That means that floors 3, 4 and 5 are nearly finished inside and out, and work will shift towards the basement, the first and second floor. Some work has already been done in the basement with utility and infrastructure upgrades. It’s really quite a feat that the building is continues to be occupied while all the construction is going on, the work split between the top half and bottom half. Also, kudos to the faculty, staff and students who have to put up with the noise and multiple moves while the work takes place. The fully-renovated Upson Hall should be ready by next August.

20160717_150119 20160717_150157 20160717_150224 20160717_150302 20160717_150321 20160717_150641

upson_4 upson_3


Actions

Information

Leave a comment